Ongoing Projects

  • Development of 30 Mtrs wise eastern road with rock fill embankment and protection work on Gadi River Bankside for Navi Mumbai International Airport.

    Dept. NameCIDCO LtdCost of ProjectRs. 3422 Lac
  • Const of Kamothe Balance work of Flyover Mumbai bound slip lane Road PQC pavement including const. of 3 Twin Box cell culvert, box drain and other allied works etc Sion-Panvel BOT Project Balance Work.

    Dept. NamePWD MumbaiCost of ProjectRs. 898.12 Lac
  • Const. of Foot-over-Bridge cover over platform (COP) structures & service building like Booking office etc. at Ranjanpada and Dronagiri stations in connection with Nerul/Belapur-Seawood-Uran Railway Project. Harsh-Thakur – JV 55-45%

    Dept. NameCENTRAL RAILWAYCost of ProjectRs. 5635 Lac
  • Construction of Bridge on stilt in Mangrove portion for proposed MSETCL & Tata Power EHVT line rerouting for Navi Mumbai International Airport Project, Navi Mumbai. ( 1st Extension).MHATRE-THAKUR JV 51%-49%

    Dept. NameCIDCO Ltd.Cost of ProjectRs. 13488 Lac
  • Construction of Bridge on diverted Ulwe River (proposed) near village Vahal for proposed MSETCL EHVT line rerouting for Navi Mumbai International Airport Project, Navi

    Dept. NameCIDCO LtdCost of ProjectRs. 1339 Lac
  • Construction of 60.0 mtrs. Wide road at the Southern Side of Navi Mumbai International Airport – Embankment Work.

    Dept. NameCIDCO LtdCost of ProjectRs. 1618 Lac
  • Balance Integrated Development of R & R Pocket No. 1 upto Stage – I at Karanjade.

    Dept. NameCIDCO Ltd.Cost of ProjectRs. 1920 Lac
  • Providing road for Rerouting of MSETCL EHVT line parallel to Amra Marg from Vahal village to PCB Bridge End.

    Dept. NameCIDCO LtdCost of ProjectRs. 1815 Lac
  • Rehabilitation & Upgradation of Pune – Mulshi – Mangaon – Mhalsa -Dighi Port and Indapur (NH-66)-Tala – Mandad – Agardanda -Dighi Port (SH-96 & SH-92), (Section-III) from existing km 0+000 (Indapur ) to km 43+925 (Agardanda) [Design km.0.000 to km. 42+345] NH-753 F to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Thakur-Mhatre JV (55%-45%)

    Dept. NameMSRDCCost of ProjectRs. 25800 Lac
  • Construction of Earthwork, Bridge work and L.C gate in between Jasai Yard to Holding Yard (From km. 85.678 to km.89.592) in Connection with 4th container Terminal at JNPT.

    Dept. NameRITESCost of ProjectRs. 2235.60 Lac
  • Page 1 of 3123