Ongoing Projects

  • Widening and Construction of MIDC road from Taloja MIDC Road to Ambernath-Katai Naka Road

    Dept. NameMMRDACost of ProjectRs. 7681.63 Lac
  • Area leveling by Cutting & Filling of the area in Sect 17 at Ulwe, Navi Mumbai (2nd Call)

    Dept. NameCIDCO Ltd.Cost of ProjectRs. 1318.44 Lac
  • Nerul/Belapur – Seawood – Uran Railway Project : Dev. of circulating area with earth filling including sand layer, provision of PVC band drain , geo-textile, preloading, const. of boundary wall and storm water drain at Ranjanpada, Nhava-sheva, Dronagiri and Uran stations.

    Dept. NameCentral RailwayCost of ProjectRs. 7795.51 Lac
  • Const. of Foot-over-Bridge cover over platform (COP) structures & service building like Booking office etc. at Ranjanpada and Dronagiri stations in connection with Nerul/Belapur-Seawood-Uran Railway Project. Harsh-Thakur – JV 55-45%

    Dept. NameCENTRAL RAILWAYCost of ProjectRs. 7000 Lac
  • Rehabilitation & Upgradation of Pune – Mulshi – Mangaon – Mhalsa -Dighi Port and Indapur (NH-66)-Tala – Mandad – Agardanda -Dighi Port (SH-96 & SH-92), (Section-III) from existing km 0+000 (Indapur ) to km 43+925 (Agardanda) [Design km.0.000 to km. 42+345] NH-753 F to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Thakur-Mhatre JV (55%-45%)

    Dept. NameMSRDCCost of ProjectRs. 25800 Lac
  • Construction of Earthwork, Bridge work and L.C gate in between Jasai Yard to Holding Yard (From km. 85.678 to km.89.592) in Connection with 4th container Terminal at JNPT.

    Dept. NameRITESCost of ProjectRs. 2235.60 Lac
  • Widening of existing container road towards east side of Y-Junction to North Gate Complex in JN Port. (Thakur Mhatre (JV), 53%-47%) (Awarded Cost Rs.98.25 Cr.)

    Dept. NameJNPTCost of ProjectRs. 9800 Lac