• Const. of formation in Embankment and Cutting, Blanketing, Rock cutting, Const. of Major & Minor Bridges, RUBs, ROBs, Const. of Drain/ Retaining wall, Ballast Supply and Removal of Infringements in Panvel-Karjat section in connection with Panvel – Karjat double line Suburban Corridor under MUTP-III in 2 LOTs. LOT-I: From Ch: 00+000 (Km) to Ch: 15+000 (Km).

    Dept. NameMRVCLCost of ProjectRs. 17224 Lac
  • Strengthening of existing bund along Gadhi River between Chainage 0 to 30 mtr. and 900 to 1150 mtr., R & R Pocket No.l at Karanjade, Pushpak Node, Navi Mumbai (Balance work)

    Dept. NameCIDCO Ltd.,Cost of ProjectRs. 1316 Lac
  • Cut & Fill works at NMIA site.

    Dept. NameHOWECost of ProjectRs. 11175 Lac
  • Construction of C.C road from plot no 18 to survey no 797 (pmc water tank to ganesh mandir to lamer complex) Sai nagar in ward no 14

    Dept. NamePanvel Muncipal CorporationCost of ProjectRs. 770 Lac
  • Reclamation in Sectors- 44 & 62 under 12.50% Scheme at Dronagiri.

    Dept. NameCIDCO LtdCost of ProjectRs. 671 Lac
  • Area leveling by Cutting & Filling of the area in Sect 17 at Ulwe, Navi Mumbai (2nd Call)

    Dept. NameCIDCO Ltd.Cost of ProjectRs. 1318.44 Lac
  • Widening of existing container road towards east side of Y-Junction to North Gate Complex in JN Port. (Thakur Mhatre (JV), 53%-47%) (Awarded Cost Rs.98.25 Cr.)

    Dept. NameJNPTCost of ProjectRs. 9800 Lac