• Development of land in Pushpak Node adjacent to NH-4B (South – East Side) near village Dapoli (Part-II) by including Land development works in R & R Pocket No. 4 & 5 at Vadghar & Karanjade
    CA 02/CIDCO/SE(AIRPORT)/EE(AIRPORT-III)/2013-2014

    Dept. NameCIDCOCost of ProjectRs. 5585.00 Lac
  • Creation of Parking Area next to Port Users Building (PUB) in JN Port.

    Dept. NameJNPTCost of ProjectRs. 362.83 Lac
  • Construction of Anti Sea-Erosion Embankment along the Beach at Shrivardhan Tal. Shrivardhan, Dist Raigad.

    Dept. NamePWD MahadCost of ProjectRs. 1043.29 Lac
  • Nerul/Belapur-Seawood-Uran Railway Project: Earthwork in embankment including top blanketing layer sand layer provision pf PVC band drain, Geo textile, pre loading at embankment construction of minor bridges, drains & track maintenance for Ch.19000 to Uran road ( Upto Ch.22500) for the project.

    Dept. NameCentral RailwayCost of ProjectRs. 2260.86 Lac
  • Bal. work of Earthwork in Emb., incl. bridge approaches, trolly refuges, blanketing materials, const. of side drains etc. and const. of Minor Bridges from Km. 136 to 144 in Pen-Roha section of Panvel-Pen-Roha doubling projects…. AGREE NO.PNVL/Pen-Roha/Rates/51.

    Dept. NameCentral RailwayCost of ProjectRs. 792.51 Lac
  • Area Leveling by Cutting & Filling in Sector-17 & 18 Under 12.5% Scheme at Ulwe CA No. 24/CIDCO/SE(BUD)/EE(B&U-II)/2007-08

    Dept. NameCIDCO ULWECost of ProjectRs. 723.33 Lac