• Integrated Development of Infrastructure works under 12.5% Scheme in Sec. 9, at Ulwe, Navi Mumbai.

    Dept. NameCIDCOCost of ProjectRs. 2438.00 Lac
  • Integrated Development of Infrastructure works in Sec 10B & Const. of S. W. Drain along 24m & 15 m wide roads in Sec. 19B, Ulwe, Navi Mumbai.

    Dept. NameCIDCOCost of ProjectRs. 1100.00 Lac
  • Various work with Sunny Vista Relators  Pvt. Ltd. at Bhokarapda, Rasayani, Panvel.

    Dept. NameHIRCOCost of ProjectRs. 3041 Lac
  • Construction of road – BRTS Corridor from  Kalewadi Phata on Aundh Ravet Road to Dehu Alandi Road.

    Dept. NamePCMCCost of ProjectRs. 3706.9 Lac
  • Const. of 30mt. Wide arterial road connecting to Sector-6,8,9,10B & sector-19,15,16,17,18 under 12.5% scheme at Ulwe CA No. 11/CIDCO/SE(BUD)/EE(B&U-II)/2007-08

    Dept. NameCIDCO Ltd.,Cost of ProjectRs. 2070.35 Lac
  • Development of integrated infrastructure works under 12.5% Scheme in Sector – 16 at Ulwe, Navi Mumbai.

    Dept. NameCIDCO Ltd.,Cost of ProjectRs. 767.53 Lac
  • Development of Integrated Infrastructure work under 12.5% scheme in Sector-17 at Ulwe, Navi Mumbai.

    Dept. NameCIDCO LtdCost of ProjectRs. 922.23 Lac
  • Taloja Industrial Area….. Providing & laying 25mm thick mastic asphalt & 40mm thick AC on deck lab and concreting to approach slab of ROB-II and repairs to service road & construction of buit-up gutter.

    Dept. NameMIDC, TalojaCost of ProjectRs. 208.44 Lac
  • Re-alingment, excavation & de-silting the nallahs in Zone-II at JNPT

    Dept. NameJNPTCost of ProjectRs. 40.560 Lac