• Construction of Road From Shell & Pearl Ceramics Ltd., to Kamani Daykem Pvt. Ltd., (Plot No. C-395 to D-55) at TTC Industrial Area, Turbhe.

    Dept. NameNavi Mumbai Municipal CorporationCost of ProjectRs. 2384 Lac
  • Integrated Development of Infrastructure works under 12.5% Scheme in Sec. 9, at Ulwe, Navi Mumbai.

    Dept. NameCIDCOCost of ProjectRs. 2438.00 Lac
  • Integrated Development of Infrastructure works in Sec 10B & Const. of S. W. Drain along 24m & 15 m wide roads in Sec. 19B, Ulwe, Navi Mumbai.

    Dept. NameCIDCOCost of ProjectRs. 1100.00 Lac
  • Vinchur Lasalgaon work at Nashik

    Dept. NamePWD, NashikCost of ProjectRs. 557.42 Lac
  • Improvement to A) Sinnar-Shirdi Road SH 39, Km 59/00 to 94/00 (Sinnar to Derdhe Phata) Tal: Sinnar, Dist. Nashik. (b) Savali-Vihir to Bharvas Phata Rd. Km.0/00  to 7/00 Tal: Sangamner, Dist.Ahmednagar

    Dept. NamePWD, NashikCost of ProjectRs. 7577.3 Lac
  • Engineering Improvement & Short term Improvement and routine maint. Of NH-4B  from KM.5/000 to Km.26/987 & Km.0/000 to 4/500 and Km.106/000 to 109/500 in the State of Maharashtra

    Dept. NameNHAICost of ProjectRs. 1387.3 Lac
  • Integrated Dev. of Infrastructure works (Internal roads, S.W.Drains, Footpath, Sewer Lines, Utility Services & Horticulture) in Sec.22, 23 & 24 of Phase-II area under 12.5% Scheme at Kamothe (CA 02)

    Dept. NameCIDCO LTD.,Cost of ProjectRs. 491.97 Lac
  • Patalganga Indl. Area Construction of Cement Concrete Road from Parade Corner to Siddheshwari Corner in Patalganga Industrial Area

    Dept. NameMIDC AlibagCost of ProjectRs. 1328.49 Lac
  • Four Lane of Dahanu Jawhar Trimbakeshwar Nashik Roads S.H. 30 Km. 115/000 to 122/500, Tal. Trimbakeshwar, Dist. Nashik

    Dept. NamePWD, Nashik (North Div.)Cost of ProjectRs. 4767.05 Lac
  • Development of integrated infrastructure works under 12.5% Scheme in Sector – 16 at Ulwe, Navi Mumbai.

    Dept. NameCIDCO Ltd.,Cost of ProjectRs. 767.53 Lac
  • Page 1 of 212