Creation of Parking Area next to Port Users Building (PUB) in JN Port.

  • Client: JNPT
  • Cost of Project: Rs. 362.83 Lac

Patalganga Indl. Area Construction of Cement Concrete Road from Parade Corner to Siddheshwari Corner in Patalganga Industrial Area

  • Client: MIDC Alibag
  • Cost of Project: Rs. 1328.49 Lac

Four Lane of Dahanu Jawhar Trimbakeshwar Nashik Roads S.H. 30 Km. 115/000 to 122/500, Tal. Trimbakeshwar, Dist. Nashik

  • Client: PWD, Nashik (North Div.)
  • Cost of Project: Rs. 4767.05 Lac

Development of integrated infrastructure works under 12.5% Scheme in Sector – 16 at Ulwe, Navi Mumbai.

  • Client: CIDCO Ltd.,
  • Cost of Project: Rs. 767.53 Lac

Construction of approach Road from Pandav Taloja Junction to HSR plot in Sector 22 at Kharghar Navi Mumbai.

  • Client: CIDCO Ltd.,
  • Cost of Project: Rs. 269.29 Lac

Providing and laying 800mm dia D.I. water supply Feeder main for Phase-II area from Amra Marg to Sector – 18 at Ulwe, Navi Mumbai.

  • Client: CIDCO Ltd.,
  • Cost of Project: Rs. 348.02 Lac

Construction of foundation & flooring for structural plant shed, structural mezzanine floor, RC framed administrative building, plant utility buildings, in-plant road/pavement, drain, boundary wall & allied work for HTP Barrel Plant at MIDC Taloja, Navi Mumbai.

  • Client: Balmer Lawire & Co. Ltd.
  • Cost of Project: Rs. 1336.97 Lac

Improvements to Chowk-Karjat-Murbad Road S.H.38 Km. 17/800  to 50/700, Taluka Karjat, Dist. Raigad.

  • Client: PWD Alibag
  • Cost of Project: Rs. 5684.31 Lac

Development of Integrated Infrastructure work under 12.5% scheme in Sector-17 at Ulwe, Navi Mumbai.

  • Client: CIDCO Ltd
  • Cost of Project: Rs. 922.23 Lac

Taloja Industrial Area….. Providing & laying 25mm thick mastic asphalt & 40mm thick AC on deck lab and concreting to approach slab of ROB-II and repairs to service road & construction of buit-up gutter.

  • Client: MIDC, Taloja
  • Cost of Project: Rs. 208.44 Lac